Search
Close this search box.

Notes, 17 Nov. 2015

Outside work on the garage is called off because of heavy rain. The crew protected the open pit with plastic before closing up last night. A cold front blew through overnight, dropping the high temperatures into the 60s with an overnight projected in the 40s. Welcome to winter in Austin.

After 5 pm, Julian and his team of tilers arrived to grout the kitchen floor.

The plumbing fixtures are still on schedule for delivery Wednesday/tomorrow.

Share the Post:

Related Posts